Ticket #276 (closed defect: fixed)
Contingency Accounting
| Reported by: | KevinLai | Owned by: | KevinLai |
|---|---|---|---|
| Priority: | highest | Milestone: | 0.5.0 Usability and Reliability |
| Component: | Auctioneer | Version: | |
| Severity: | normal | Keywords: | |
| Cc: |
Description
Contingency accounting is incorrect. The contingency funding pool and the expected value pool is shared and re-split at every accounting interval. They should be separate. This would have the effect of keeping expected value bids constant over time and allowing a large contingency funding pool to build up, thus providing better predictability.
Change History
Note: See
TracTickets for help on using
tickets.
